SMCP-70J Extrusion puff Machine Installation Operation( installation process, operate process)

Hits:Date:2017-11-01

SMCP-70J EXTRUSION BULKING MACHINE
              Visit computer Visit Phone



1. The introduction: spare parts of the machine head; First, they are the spare parts which disassembly from the extrusion puff machine head. Every spare parts need to assemble to the machine, then the machine could work safe and well. Below is picture for all the spare parts.

                2-1

2. The machine accessories as gift: 27# Open spanner 2 pieces
            22# Open spanner 1 pieces
            22# Double Offset Ring Spanner 1 pieces
            Screwdriver 1 pieces

                3-1

3. The description of the control panel operation.
Main power switch: Control the machine power.
Indicator: The red one light up mean machine work well.
Spin Butter: Control the cutter on-off.
Debugging switch: factory default 60p, control the cutter's speed. High speed, short length of puffed material. Low speed, long length of puffed material.

                4-1

4.The introduction about the die hole; Our machine could puff various shape, the hole diameter will affect the puff material size, the red mark show the difference. Now we can puff the shape: big rice shape, small rice shape, star shape, round shape.

                 5-1

5. The description of the steel stamp on the screw barrel; The steel stamp means the puff degree. We also have one screw barrel without the stamp, which mean low puff degree.


                6-1

6.The way to install the patch; Next, we need to assemble the die and the patch. The die and the patch need very close, pls see the picture. It's flat. Our advice is use a small wrench lightly tapped up, until it can not be closed any more.

               7-1

                 7-2

7.The way to install the screw barrel; The screw need to put into the barrel, the picture above show how to install the screw and barrel. The screw hollow side match the barrel bulge side, then put the screw into the barrel. (The picture 3)

              8-1

8.After install the screw barrel; We need to install the screw barrel into the machine head, the screw barrel bulge side match the machine head dent side. Then push. Now the screw and the barrel can not be parallel, need clockwise twist a circle for the screw, keep the screw and the barrel parallel.

                9-1

9.The way to install the die; After the die heated, be careful, pls safety conscious when install the die. The screw thread short side twists in. Attention, the four whole need be match, and fit up parallel.

                10-1

10.How to install the 4 bolts. The sequence to install the bolts is angel install. Pls don't tight the bolts directly, as it will affect the puffed material shape. Now, need the tight the bolts tight, until it can't be tight any more. The tighter the better, so the puffed size will be even and same.

              11-1

               11-2

11.The way to install the cutter, the hole match the bulge part, pls check the picture 2. It's installed cutter, then the cutter outward install to the machine head.

               12-1

12.The patch install, remember, not leak the patch, install the patch and screw on two bolts.

How to adjust the puff degree? There is a point, very important, the two bolts tightness should be just right. Not to tight or loose. Pls check the vedio on 12 min 50 second. First screw the bolt inside, then the outside bolt. If the pulley is too heavy, need to loose the bolt inside, then tight the outside bolt. The specific tightness needs to rely on their own operate, more practice makes perfect.

               13-1

13.The way to install the shield. The install of the shield is relatively simple, just the large hole inwards, and install the bolts.

               14-1

14. Finally, explain extrusion bulking machine controller circuit related problems;From left to right, by the ac contactor, fault and fault facies protector, frequency converter;Communication protector mainly control the main motor running, fault and fault facies protector, mainly used in the wrong order or lack of phase rise to disconnect the circuit protection device, frequency converter to control the main motor and small motor, is the central controller of the machine, do not damage!


  Our machine design pay more attention to the safety problem, the operate safety problem. Attention, when the machine works smooth, use the shield. Safe production, safe is the most important thing. Because the belt running speed is high, if anything go into the belt, and machine stuck, it not good for the machine, and not good for the operate workers safety.


                15-1

15.Put small amount of rice in the hopper; Get ready to production; Before to produce, please confirm the machine power is properly connected? Are all parts of the machine already finished debugging? At first, don't put too much rice into the hopper, careful observe the shape of puffs, puffing degree, etc., The amount of rice can be gradually increased, so that the effect of puffed rice can be guaranteed. Beautiful shape, right size. During the puffing process, according the actual operation needs, adjust the cutter speed. Which can change the puffed cereal shape and size. When the machine is work smooth, don't adjust the machine head, to avoid being hurt by the belt!


No matter what kind of material is puffed. After puffing completed, put a handful soybeans into the machine. It will help the machine clean. Because the soybeans contain oil, will good for the machine.


After the machine use, need to disassemble the screw barrel, die, the die use gas stove or natural gas burn, do not use the induction cooker, clean the residual waste inside. Heating about 15 minutes, then take the die down; Remove the patch first, use a wool brush fixed die, with a screwdriver can remove the patch. Then use steel wire to clear the hole to prepare for the next use;


Reminder: The following video has been encrypted, please purchase our machine, ask the video password to the sales staff


Key:Extrusion puff machine, installation process, operate process, food extruder

樹(shù)新機(jī)械工商登記信息 樹(shù)新機(jī)械資格認(rèn)證 樹(shù)新機(jī)械分站2 樹(shù)新機(jī)械分站1

主站蜘蛛池模板: 麻豆国产精品一二三区 | 中文字幕日韩精品一区二区中文 | 国产91精品久久久久久 | 亚洲图片小说 | 午夜性爽快免费视频播放 | 久久av无码精品人妻系列漫 | 亚洲精品无码日韩国产不卡aⅴ | 亚洲系列 | 久久无码高潮喷吹捆绑 | 欧美+亚洲+精品+三区 | 精校小说| 午夜影视九九国产 | 亚洲欧美日韩综合一区 | 午夜成人在线观看 | 久久久g0g0午夜无码精品 | 亚洲国产精品日韩av不卡在线 | 国产精品日日夜夜 | 亚洲福利视频 | 免费观看国产一区二区三区 | 蜜桃国产а√乱码精品一区二区 | 免费无码无遮挡在线v视频 免费无码一级a在线播放 | 国产av无码熟妇人妻麻豆 | 国产凸凹视频一区二区 | 精品女同一区二区三区在线观看 | 国产自拍偷拍在线一区二区 | 国内精品一区二区三区 | 精品国产成人t | 女同精品一区二区 | 免费久久人人爽人人爽av | 国产aⅴ无码专区亚洲aⅴ毛 | 亚洲无码动态图 | 国产成人亚洲精品无码h在线 | 国产欧美日本高清不卡视频 | 91福利在线视 | 欧美最猛性xxxxx大叫 | 免费国产成人高清在线视频 | 久久久91精品国产 | 国产亚洲视频在线观看播放 | 午夜成人在线视频 | 中文字幕乱 | 在线观看国产亚洲视频免费 |